Mumbai Metro Rail Map - Summary
Metro service is available for the general public every day from 6 am to 10 pm. According to MMRDA commissioner SVR Srinivas, around 60 CCTV cameras have been installed at each station, the footage of which will be provided directly to the police. MMRDA has said to start service on the remaining route of Metro-7 and Metro 2A in the next six months.
The Mumbai Metro is a rapid transit system serving the city of Mumbai, Maharashtra, and the wider metropolitan region. It is being built in three phases over a 15-year period, with overall completion expected in 2025.As of August 2020, the Mumbai metro consisted of 1 operational line (Line 1 – elevated metro from Versova to Ghatkopar).
Mumbai Metro Rail Lines
Metro Line | Name of Corridor | Colour | Stations | Length (KM) | Status |
---|---|---|---|---|---|
Mumbai Metro Line 1 | Versova – Andheri – Ghatkopar | Blue Line | 12 | 11.4 | Fully Operational |
Mumbai Metro Line 2A | Dahisar(E) – Andheri West | Yellow Line | 17 | 18.6 | Fully Operational |
Mumbai Metro Line 2B | Andheri West – Mandala | Yellow Line | 22 | 23.6 | Under Construction |
Mumbai Metro Line 3 | Colaba – Bandra – SEEPZ | Aqua Line | 27 | 33.5 | Under Construction |
Mumbai Metro Line 4 | Wadala – Mulund – Thane – Kasarvadavali | Green Line | 32 | 32.32 | Under Construction |
Mumbai Metro Line 4A | Kasarwadavali – Gaimukh | Green Line | 2 | 2.88 | Under Construction |
Mumbai Metro Line 5 | Thane – Bhiwandi – Kalyan | Orange Line | 17 | 24.9 | Under Construction |
Mumbai Metro Line 6 | Swami Samarth Nagar – KanjurMarg – Vikhroli | Pink Line | 13 | 14.7 | Under Construction |
Mumbai Metro Line 7 | Dahisar (East) – Gundavali | Red Line | 13 | 16.5 | Fully Operational |
Mumbai Metro Line 7A | Andheri (E) – CSI Airport | Red Line | 2 | 3.17 | Under Construction |
Line-8 | CSIA – NMIA | Gold Line | 7 | 35 | Proposed |
Mumbai Metro Line 9 | Dahisar (E) – Mira Bhayander | Red Line | 8 | 11.38 | Under Construction |
Line-10 | Gaimukh – Shivaji Chowk (Mira Road) | Green Line | 9 | 9.2 | Approved |
Line-11 | Wadala – Chhattrapati Shivaji Maharaj Terminus | Green Line | 11 | 12.7 | Approved |
Line-12 | Kalyan – Dombivali – Taloja | Orange Line | 17 | 20.7 | Approved |
Line-13 | Shivaji Chowk (Mira Bhayander) – Virar | Purple Line | 20 | 23 | Proposed |
Line-14 | Kanjurmarg – Badlapur | Magenta Line | 40 | 45 | Proposed |
You can download the Mumbai Metro Rail Map PDF using the link given below.