BSPHCL New Electricity Connection Form (Low Tension Supply) - Summary

Bihar State Power Holding Company Limited (BSPHCL) provides a simple way to get a new electricity connection using the BSPHCL New Electricity Connection Form (Low Tension Supply). You can easily download the form in PDF format from the link given below.

BSPHCL New Electricity Connection Form (Low Tension Supply)

To assist you in completing the submission process for the BSPHCL New Electricity Connection Form, here are the steps you should follow:

  1. First, you need to get the form from the relevant office (remember to pay for the form if needed) or conveniently download the form using the link below.
  2. Fill out the application form and submit it, along with the necessary documents, to the concerned authorities at the office. (Don’t forget to include the licensed electrical contractor who will do the wiring.)
  3. The authorities will check the documents you provided. If everything looks good, they will ask you to pay the required fee for the process.
  4. After making the payment, you will receive a receipt. Make sure to keep it safe for future references.
  5. Your application will now go through internal processing, and a technician will visit your place on a scheduled date, along with you.
  6. During this visit, the technician will figure out where to install the meter and how the supply mains and other necessary equipment will be set up. He will also prepare a survey report.
  7. If the report shows that providing electricity is possible, you will get a notification regarding the sanction.
    1. If you do not comply within the specified time according to the rules following the power sanction, both the power sanction and registration will be canceled.
    2. If the report shows that it is not feasible, you will need to cover any extra costs to make the conditions suitable, as suggested by the department.
  8. Next, visit the office to ask about service line charges, the initial security deposit, and costs for the meter/metering equipment, etc. Make the required payment and obtain a receipt along with your application number.
  9. Once all the steps mentioned above are completed, the electricity department/company will give you a work order.
  10. After this, the concerned Junior Engineer/Assistant Engineer will make arrangements for your power supply.
  11. A pole will be set up, and you must present the test report with the help of a licensed electrical contractor before you receive the electrical connection.