Mumbai Metro Rail Map

❴SHARE THIS PDF❵ FacebookX (Twitter)Whatsapp
REPORT THIS PDF ⚐

Mumbai Metro Rail Map

Metro service is available for the general public every day from 6 am to 10 pm. According to MMRDA commissioner SVR Srinivas, around 60 CCTV cameras have been installed at each station, the footage of which will be provided directly to the police. MMRDA has said to start service on the remaining route of Metro-7 and Metro 2A in the next six months.

The Mumbai Metro is a rapid transit system serving the city of Mumbai, Maharashtra, and the wider metropolitan region. It is being built in three phases over a 15-year period, with overall completion expected in 2025.As of August 2020, the Mumbai metro consisted of 1 operational line (Line 1 – elevated metro from Versova to Ghatkopar).

Mumbai Metro Rail Lines

Metro Line Name of Corridor Colour Stations Length (KM) Status
Mumbai Metro Line 1 Versova – Andheri – Ghatkopar Blue Line 12 11.4 Fully Operational
Mumbai Metro Line 2A Dahisar(E) – Andheri West Yellow Line 17 18.6 Fully Operational
Mumbai Metro Line 2B Andheri West – Mandala Yellow Line 22 23.6 Under Construction
Mumbai Metro Line 3 Colaba – Bandra – SEEPZ Aqua Line 27 33.5 Under Construction
Mumbai Metro Line 4 Wadala – Mulund – Thane – Kasarvadavali Green Line 32 32.32 Under Construction
Mumbai Metro Line 4A Kasarwadavali – Gaimukh Green Line 2 2.88 Under Construction
Mumbai Metro Line 5 Thane – Bhiwandi – Kalyan Orange Line 17 24.9 Under Construction
Mumbai Metro Line 6 Swami Samarth Nagar – KanjurMarg – Vikhroli Pink Line 13 14.7 Under Construction
Mumbai Metro Line 7 Dahisar (East) – Gundavali Red Line 13 16.5 Fully Operational
Mumbai Metro Line 7A Andheri (E) – CSI Airport Red Line 2 3.17 Under Construction
Line-8 CSIA – NMIA Gold Line 7 35 Proposed
Mumbai Metro Line 9 Dahisar (E) – Mira Bhayander Red Line 8 11.38 Under Construction
Line-10 Gaimukh – Shivaji Chowk (Mira Road) Green Line 9 9.2 Approved
Line-11 Wadala – Chhattrapati Shivaji Maharaj Terminus Green Line 11 12.7 Approved
Line-12 Kalyan – Dombivali – Taloja Orange Line 17 20.7 Approved
Line-13 Shivaji Chowk (Mira Bhayander) – Virar Purple Line 20 23 Proposed
Line-14 Kanjurmarg – Badlapur Magenta Line 40 45 Proposed

You can download the Mumbai Metro Rail Map PDF using the link given below.

Mumbai Metro Rail Map PDF Free Download

REPORT THISIf the purchase / download link of Mumbai Metro Rail Map PDF is not working or you feel any other problem with it, please REPORT IT by selecting the appropriate action such as copyright material / promotion content / link is broken etc. If this is a copyright material we will not be providing its PDF or any source for downloading at any cost.

SIMILAR PDF FILES