Electricity Rules 2020

Union Ministry of Power has promulgated rules laying down the rights of power consumers in the country.  While issuing these rules here today via Press Conference, Shri R.K.Singh, the Union Minister of State (Independent Charge) for Power and New & Renewable Energy, said, “These rules shall empower the consumers of electricity and added that these Rules emanate from the conviction that the power systems exist to serve the consumers and the consumers have rights to get the reliable services and quality electricity.” He said that Distribution Companies across the country are monopolies – whether government or private – and the consumer has no alternative – therefore it was necessary that the consumers’ rights be laid down in Rules and a system for enforcement of these rights be put in place.  “This is what the rules provide for”, Shri Singh said.

 Following key areas are covered in the Electricity (Rights of consumers) Rules:

a)         Rights of consumers and Obligations of Distribution licensees

b)         Release of new connection and modification in an existing connection

c)         Metering arrangement

d)         Billing and Payment

e)         Disconnection and Reconnection

f)          Reliability of supply

g)         Consumer as Prosumer

h)         Standards of Performance of licensee

i)          Compensation Mechanism

j)          Call Centre for Consumer Services

k)         Grievance redressal mechanism

Rights and Obligations.-

  • It is the duty of every distribution licensee to supply electricity on request made by an owner or occupier of any premises in line with the provisions of the Act.
  • It is the right of a consumer to have minimum standards of service for the supply of electricity from the distribution licensee.

Release of new connection and modification in an existing connection.-

  • Transparent, simple, and time-bound processes,
  • An applicant has an option for online application,
  • The maximum time period of 7 days in metro cities and 15 days in other municipal areas and 30 days in rural areas identified to provide new connection and modify an existing connection:

Metering –

  • No connection shall be given without a meter
  • Meter shall be the smart pre-payment meter or pre-payment meter.
  • Provision of Testing of meters
  • Provisions for replacement of defective or burnt or stolen meters specified

Billing and payment –

  • Transparency in applicable consumer tariff and bills
  • Consumers shall have the option to pay bills online or offline.
  • Provision for advance payment of bills

Reliability of supply

  • The distribution licensee shall supply 24×7 power to all consumers. However, the Commission may specify lower hours of supply for some categories of consumers like agriculture.
  • The distribution licensee shall put in place a mechanism, preferably with automated tools to the extent possible, for monitoring and restoring outages.

Consumer as prosumer

  • While the prosumers will maintain consumer status and have the same rights as the general consumer, they will also have the right to set up Renewable Energy (RE) generation unit including roof top solar photovoltaic (PV) systems – either by himself or through a service provider.
  • Net metering for loads up to ten kW and for gross metering for loads above ten kW.

Standards of performance.

  • The Commission shall notify the standards of performance for the distribution licensees.
  • Compensation amount to be paid to the consumers by the distribution licensees for violation of standards of performance

Compensation mechanism

  • Automatic compensation shall be paid to consumers for which parameters on standards of performance can be monitored remotely.
  • The standards of performance for which the compensation is required to be paid by the distribution licensee include, but are not limited to, the following, namely:-
    • No supply to a consumer beyond a particular duration, to be specified by the Commission;
    • Number of interruptions in supply beyond the limits as specified by the Commission;
    • Time is taken for connection, disconnection, reconnection, shifting;
    • Time is taken for a change in the consumer category, load;
    • Time is taken for a change in consumer details;
    • Time is taken for replacement of defective meters;
    • The time period within which bills are to be served;
    • Time period of resolving voltage related complaints; and
    • Bill related complaints.

  Call Centre for Consumer Services

  • Distribution licensee shall establish a centralized 24×7 toll-free call center
  • Licensees shall endeavor to provide all services through a common Customer Relation Manager (CRM) System to get a unified view

Grievance redressal mechanism .-

  • Consumer Grievance Redressal Forum (CGRF) to include consumer and prosumer representatives.
  • The consumer grievance redressal has been made easy by making it multi-layered and the number of consumer’s representatives has been increased from one to four.
  • The licensee shall specify the time within which various types of grievances by the different levels of the forums are to be resolved. Maximum timeline of 45 days specified for grievance redressal.

General Provisions.-

  • Use of online access to various services such as application submission, monitoring status of the application, payment of bills, the status of complaints raised,etc., to consumers through its website, web portal, mobile app, and its various designated offices area-wise.
  • The distribution licensee shall provide all services such as application submission, payment of bills, etc., to senior citizens at their door-steps.
  • The details of scheduled power outages shall be informed to the consumers. In case of an unplanned outage or fault, immediate intimation shall be given to the consumers through SMS or by any other electronic mode along with an estimated time for restoration.

For more details download the Electricity Rules 2020 in PDF format using the link given below or an alternative.

2nd Page of Electricity Rules 2020 PDF
Electricity Rules 2020

Electricity Rules 2020 PDF Free Download

REPORT THISIf the purchase / download link of Electricity Rules 2020 PDF is not working or you feel any other problem with it, please REPORT IT by selecting the appropriate action such as copyright material / promotion content / link is broken etc. If this is a copyright material we will not be providing its PDF or any source for downloading at any cost.

SIMILAR PDF FILES